Cherokee County, NC (Murphy): U.S. 64 Construction (NCDOT)

    DIVISION:

    Construction

    ROLE:

    Prime Contractor

    OWNER:

    NCDOT

    CONTRACT VALUE:

    $53,000,000.00

    COMPLETION DATE:

    September 2009

    Grading, drainage paving, signals and structures along US Highway 64 from US 19-74-129 in Murphy, NC to east of NC141 Peachtree.  Work included the excavation of 3,875,000 cubic yards of dirt and rock.  Approximately 70% of the project was drilled and shot by WB forces.  The project also included construction of 5 bridges; 3 over the streams and 2 over roadways; and a cast in place 535 FT long double barrel box culvert.  The project was constructed on new alignment.

    This project was completed 9 months ahead of schedule.