LOCATION
Tennessee
DIVISION:
ROLE:
Prime Contractor
OWNER:
Undisclosed
ENGINEER:
Atwell
CONTRACT VALUE:
$130,000,000.00
COMPLETION DATE:
August 2015
This project began in December 2010. Wright Brothers functioned as the civil contractor for the site. Our completed work includes moving 4,835,770 CY of excavated material, 27,000LF of storm sewer pipe, driven 135,000 LF of H-piling, poured 10,000CY of pipe rack foundations and piers, placed over 350,000TN of stone, excavated / prepared 25 building foundations, completed the grading, drainage, and utilities for the 72,000SF Wacker site office complex, built a 56,662SY off-site parking lot, installed 900,000LF of electrical duct bank, 25,770LF of sanitary and inorganic sewer, 28,975LF of domestic and fire water, 9475LF of cooling water, 60 duct bank vaults, 43,000TN of sand, installed a three span temporary bridge, constructed an 8’x8’ box culvert, heavy lift placement of equipment, asphalt placement, concrete curb and multiple flatwork concrete contracts. At the height of construction Wright Brothers supervised 15 separate crews totaling 150 individuals with 115 pieces of heavy earth moving equipment, cranes and support elements. Wright Brothers has ongoing contracts for building utility connections, heavy lift equipment packages, river water intake piping and structural concrete.